Do you have any plans to remodel your home, then you need an environmental permit (building permit). House Check is an expert in the field of preparing and applying for an environmental permit. We ensure the required documents, the request for you in and consult with the municipality.

Our architectural drawings and structural calculations are submitted by all public authorities recognized and are in conformity with the current regulations. Due to the many requests that we have submitted, we are now well known to the city of Amsterdam.

All types of licenses

We have all the expertise of foundation recovery to a rooftop terrace

No waiting times

Within two days we can start the work. At HouseCheck there are no waiting times.

Competitive rates

An application area permit is a lot of work, but because of our experience we work fast

Method

-You will always receive first of us a no obligation quote;
– We come to you in the House measure and your wishes by;
-Then we will start the same day with the elaboration of the architectural drawings (this takes about 3-4 days);
-After the drawings are ready, you will receive this by email as a draft. If you wish we can still easily customize adjustments;
-After you accept the drawings (if applicable) will make our constructor the construction calculation (this takes about a day);-
After the calculation is complete, the application via the environment desk.
The drawings, calculation and a picture will be uploaded;

A claim is made and it is for the time being, wait and see, we keep in touch with the municipality and take you.

Why submit your license by HouseCheck?

– We take the whole process off your hands;
– Within 2 days (if desired) we start with the work, so no waiting;
– Well aware of the rules;-clear communication; When message comes from the municipality we bring you here always know;
– No costs afterwards; If the application needs to be adapted, we charge no extra fees;
– A success rate of 97% that the license will be actually granted;-fair; If an application has no chance of success, we take the command not to and we will provide you the request advise against unnecessary costs.

How does an application area permit work?

1

Request a quote via our website or by phone

2

You will receive our quote within 24 hours

3

After agreement quote we make an appointment

4

We come along and measure the home

5

Within 2 weeks its ready for submission

6

After two months you will receive the license

Request an area permit cost

Please note: we always sent you a quote in advance. 

Frequently asked questions Price incl. VAT
 Roof terrace  € Price on request
 Wall breakthrough  € Price on request
 Involve storage room at home  € Price on request
 Development  € Price on request

Wat krijgt u bij een omgevingsvergunning

A valuable document; the environmental permit

Detailed architectural drawings

A construction calculation

We take care of all communication

Aftercare

By Guido’s know-how we have not bought a house because it had a lot of risk in the bathroom. Forever grateful:).

Alex Pepermans, Amsterdam (google reviews)

Copyright © 2013 - 2023 HouseCheck Amsterdam. Alle rechten voorbehouden - Site gemaakt door NivendMedia